Bishop’s Hill is an OO gauge layout conceived as something of a “training” layout for those members of the club wanting to get a bit more experience. Construction started in 2016, and track laying was in progress as of mid-2017. The layout is being wired for DCC operation, with MegaPoints solenoid controllers and multi panel processors.
After a pandemic induced hiatus, all tracks were operational by April 2022.
Work has continued with the establishment of a village corner, a station with on-bridge buildings and an industrial area.
Layout pictures
- Where should the goods shed go?
- Setting out the viaduct curve on Bishop’s Hill
- Setting out the viaduct curve on Bishop’s Hill
- The viaduct base under construction (Sept 2018)